intermodal solutions


Verona Train

The fast train need only 24 hours connect both hubs. The train schedule is linked to the timetable of the Gothenburg - Kiel route

For the time being we can offer two departures in each direction per week. The train has a capacity of 25 trailer units but can also be used for container transport. Now the train became even more attractive since pickup time in Verona on fridays is already at 06.00h. 

Each train is saving 1.7 millions of Co2 per direction compared with common road transportation.