Starting 6 September the Stena Transfer will be replaced by the Stena Carrier. And in December 2010 we will replace the Stena Partner with the Stena Freighter. With the introduction of the Stena Carrier (which will be deployed in the night schedule ex Europoort and the morning schedule from Harwich) we have the possibility to depart Europoort at 21:30 hours (local time) instead of 20:45 and arrive Harwich at the same favorable time 03:45 hours.
The Stena Partner will be deployed in the morning schedule ex Europoort and the evening schedule ex Harwich during this time.
From Europoort Departure Arrival 10:30 17:30 21:30* wef 06.09.2010 03:45
From Harwich Departure Arrival 07:45 16:45 21:30 06:30
With the deployment of these ships we are also able to operate with a cut off time of 1 hour prior to departure (non hazardous) instead of 1.5 hours.
Please note that the cut off time for hazardous cargo remains 2 hours prior to departure!
Should you have any questions or require more information, please contact your Stena Line account manager.
Gothenburg-Frederikshavn
Varberg-Grenaa
Gothenburg-Kiel
Frederikshavn-Oslo
Karlskrona-Gdynia
Belfast-Stranraer
Larne-Fleetwood
Dublin-Holyhead
Dun Laoghaire-Holyhead
Rosslare-Fishguard
Harwich-Hoek van Holland
Harwich-Rotterdam
Killingholme-Hoek van Holland
Helsingborg-Helsingor
Trelleborg-Rostock
Trelleborg-Sassnitz